Step 1: What happened
DOM was the main contractor for addition and alteration works to a 4-storey factory building owned by DON, under a contract on the SIA Lump Sum Conditions. DON took possession at the beginning of 2017, and disputes followed. DOM referred them to arbitration on 31 January 2018, claiming for variation orders among other things; DON counterclaimed for delay and for the cost of rectifying defects through other contractors it appointed. In an interim award amended on 12 September 2024, the tribunal awarded DOM S$704,124.10 for its variation orders and DON S$4,926,848.16 for defects, including S$985,981.62 in consultants' fees, each with interest at 5.33% a year.
In Originating Application No 1285 of 2024, DOM applied to set aside parts of the award covering consultants' fees, timber decking, plaster, doors, the garment care area and roof waterproofing, ducting, toilets and painting, and the pre-award interest. It relied on breach of natural justice, on fraud in relation to the timber decking, and on public policy. DON opposed the application and asked, in the alternative, for any affected portion to be remitted to the tribunal.
Step 2: What the court had to decide
- Whether the tribunal breached natural justice by awarding 50% of consultants' fees it had found unexplained or unnecessary
- Whether the tribunal's percentage apportionments and treatment of the various defect claims were unforeseeable, incongruent or made without applying its mind
- Whether the timber decking award was induced or affected by fraud
- Whether the pre-award interest breached natural justice or public policy, and whether set-aside portions should be remitted
Step 3: How the court reasoned
A setting-aside court reads awards generously and does not review the merits; errors of fact or law, and an inadequate statement of reasons alone, are not grounds. A chain of reasoning challenge succeeds only if a reasonable litigant could not have foreseen the reasoning.
On consultants' fees, following Sandy Island it was foreseeable that the tribunal might accept fees supported only by invoices if it found the engagement reasonable and necessary. But for the project manager, the M&E engineer and the structural engineer, the tribunal had effectively found their services unnecessary or not shown to relate to the rectification works, yet still awarded half. Following CEF and another v CEH [2022] 2 SLR 918, no reasonable litigant could have foreseen that, and DOM was prejudiced. Remission was refused because a reasonable person would lack confidence in a fair reconsideration and the result would logically be the same. For the contract administrator and quantity surveyor, whose necessity was not doubted, apportionment was a foreseeable middle path drawn from DOM's own argument about overlapping hours.
The defect complaints failed. The 10% reductions for timber decking and external plaster flowed from competing causes the parties had argued, and the same figure did not show the tribunal failed to apply its mind. The tribunal did deal with the internal seepage item, the doors, the pro-rated garment care area and the warranty argument; DOM's points on the roof valuation and paint were at most errors of fact, or mistakes in its favour. The expert's statement that the decking manufacturer was out of business was not shown to be meant to deceive, so fraud failed. DON had pleaded interest, so DOM had notice, and DOM abandoned the public policy point.
“The parties in this case would have expected that, at the very least, the tribunal would only award consultants’ fees that the tribunal found to be necessary.”
[2025] SGHC 103 at [76]
Step 4: The order
The High Court allowed DOM's application in part. It set aside the portions of the award granting DON S$127,151.50, S$87,475.00 and S$32,500.00, being 50% of DON's claims for the fees of the project manager, the M&E engineer and the structural engineer, and declined to remit them. It dismissed the application to set aside all other portions of the award, including the pre-award interest, and directed costs submissions.
Court record
Key facts
| Court | High Court |
|---|---|
| Decided | |
| Judge | Wong Li Kok, Alex |
| What the case was about | Arbitration |
Source: [2025] SGHC 103, High Court, decided — eLitigation. Updated .
Judge
- Wong Li Kok, Alex Delivered the judgment
Parties
- DOM Applicant
- DON Respondent
Counsel
- Christopher Chuah Law Chambers LLC Firm
- Chiam Yunxin
- Chuah Chee Kian Christopher
- Hoe Siew Min, Deborah (He Xiumin)
- Lee Hwai Bin
- Michelle Choy Shi Qi
- Tan Kok Quan Partnership Firm
- Darren Ng Zhen Qiang
- Lee Lyi Shyuenn
- Nayo Leong
- Parmar Karam Singh
- Tnee Zixian Keith (Zheng Zixian)
- Tyronne Toh Jia-En
Cases cited (24)
- CYE v CYF [2023] SGHC 275
- FIC Properties Sdn Bhd v PT Rajawali Capital International and another [2024] SGHC(I) 33
- DKT v DKU [2025] SGCA 23
- [2022] SGCA 1
- [2022] SGHC 69
- [2007] 3 SLR(R) 86
- [2008] 2 SLR(R) 623
- [2008] 2 SLR(R) 929
- [2012] 1 SLR 676
- [2013] 1 SLR 125
- [2015] 3 SLR 488
- [2016] 1 SLR 859
- [2016] 5 SLR 54
- [2018] 1 SLR 1
- [2018] 2 SLR 1311
- [2020] 1 SLR 695
- [2020] 5 SLR 484
- [2022] 1 SLR 505
- [2022] 2 SLR 918
- [2024] 1 SLR 32
- [2024] 5 SLR 706
- [2025] 1 SLR 526
- [2025] 1 SLR 88
- [2002] EWHC 597
Related cases
Other Singapore judgments on the same subject, most closely matched first.
-
The Court of Appeal dismissed the appeal and ordered the appellants to pay the respondents costs fixed at $90,000 (all-in) on the standard basis.
Court of Appeal (International) · 15 September 2026 · [2026] SGCA(I) 4 -
The High Court allowed Moveon's application, refused enforcement of the interim award under s 31(2)(d) of the International Arbitration Act 1994, and set aside the enforcement order, holding that the…
High Court · 11 September 2026 · [2026] SGHC 186 -
The court dismissed all three applications in their entirety with costs, to be agreed or fixed on written submissions, leaving the Quantum Award and Final Award in place.
Singapore International Commercial Court · 26 August 2026 · [2026] SGHC(I) 15 -
The High Court dismissed both applications, upholding the Partial Final Award and the Costs Award, and ordered DVV to pay DVW's costs of both applications, to be agreed or fixed after written…
High Court · 6 August 2026 · [2026] SGHC 164 -
The High Court dismissed BREB's application to set aside the award in its entirety, with costs to be agreed or decided on written submissions.
High Court · 5 August 2026 · [2026] SGHC 163 -
The court ordered the claimant to pay the defendant's costs of SUM 1193 in the total sum of $37,840.75, made up of $7,000 for work before the transfer, $28,000 for work after the transfer and…
Singapore International Commercial Court · 30 July 2026 · [2026] SGHC(I) 12
Read the full judgment
The judgment itself is on the official Singapore Courts portal.
Read on eLitigationSource: eLitigation ([2025] SGHC 103)
This page sets out what the court decided, for learning. It is information, not legal advice. Disclaimer