COSCO Shipping Specialized Carriers Co., Ltd. v PT Oki Pulp & Paper Mills and others

High Court

[2024] SGHC 92 · HC/ADM 50/2022 ( HC/SUM 2676/2023 ) · cites 26 cases (20 Singapore, 6 foreign) · cited by 3 cases

The question

Does an arbitration clause in bills of lading cover a tort claim for a ship striking a bridge?

The answer

No. The High Court held the shipper's claim was a stand-alone tort claim not arising out of the bills of lading, found no exclusive jurisdiction agreement or vexatious conduct, and dismissed the anti-suit injunction application.

Step 1: What happened

COSCO Shipping Specialized Carriers Co., Ltd. (CSSC), a Chinese company, owned the vessel LE LI. The vessel was chartered to a related Dutch company and sub-chartered to PT OKI Pulp & Paper Mills (OKI), an Indonesian pulp and paper maker that claims to own and operate a port terminal near its mill in Palembang. CSSC issued nine bills of lading to OKI as shipper on 31 May 2022. That day, shortly after leaving the jetty, the vessel struck the trestle bridge linking the jetty to the mainland, and a section of some 220 metres collapsed.

CSSC began limitation proceedings in Singapore in Admiralty in Personam No 50 of 2022 on 4 August 2022. OKI sued CSSC in the Kayu Agung District Court in Indonesia on or about 26 October 2022, initially estimating its losses at US$592,787,794.00. OKI's challenge to the Singapore court's jurisdiction failed, after which it was allowed to withdraw its notice of intention to contest, and CSSC obtained a limitation decree on 5 October 2023.

By HC/SUM 2676/2023, CSSC sought an anti-suit injunction to stop OKI pursuing the Indonesian proceedings. It relied on an arbitration clause in the head charter said to be incorporated into the bills of lading, an alleged exclusive jurisdiction agreement made in emails between lawyers, vexation and oppression, and the need to protect the Singapore court's processes. The judge dismissed the application on 27 December 2023, heard further arguments on 7 February 2024, and gave these grounds.

Step 2: What the court had to decide

  1. Whether OKI's Indonesian tort claim for the bridge damage arose out of or in connection with the bills of lading so as to breach the arbitration agreement
  2. Whether an exclusive jurisdiction agreement in favour of the Singapore courts was concluded through the lawyers' emails
  3. Whether a non-contractual anti-suit injunction should issue because the Indonesian proceedings were vexatious or oppressive
  4. Whether a protective anti-suit injunction was needed to safeguard the Singapore limitation and arbitral proceedings

Step 3: How the court reasoned

On the arbitration ground, the court characterised OKI's claim as a stand-alone tort claim under Singapore, English and Indonesian law alike. Adopting the causative connection test from The Pola Devora, it found nothing in the bills of lading creating a relationship beyond carrier and shipper; references to the loading port, the mill and a generic exclusion clause did not make OKI a jetty owner or mill owner under the contract, and a mere overlap in time was not enough. Unlike The Angelic Grace, the contract had no terms allocating allision risk. Drawing on Mozambique, the court held that the defences under cl 63 and cl 66 were subordinate issues; only a safe port claim might itself be arbitrable, which did not pull OKI's tort claim into arbitration.

On the jurisdiction agreement, OKI's lawyers had proposed Singapore courts expressly subject to their client's final approval, so there was at most an invitation to treat and nothing CSSC could accept.

On the non-contractual injunction, OKI was amenable to the court's jurisdiction, but Indonesia, where the tort occurred and the bridge stands, was the natural forum. The court doubted that the Carriage of Goods by Sea Act or the limitation provisions were forum mandatory statutes and found the argument circular. Evergreen was distinguished because there the limitation fund had already been constituted and Singapore was the natural forum; here the Indonesian suit predated the decree, CSSC disputed liability and was challenging Indonesian jurisdiction, as in The Western Regent. OKI's conduct in the Singapore action had not been abusive.

A protective injunction failed because there was no breach of the arbitration agreement and it would be premature, and contrary to comity, to pre-empt the Indonesian court's ruling on its own jurisdiction.

From the judgment

“In my judgment, something more was required than a mere temporal overlap in events.”

[2024] SGHC 92 at [101]

“For the reasons set out above, I was of the view that there were no grounds for granting CSSC the injunctive relief it sought. I therefore maintain my earlier decision to dismiss SUM 2676.”

[2024] SGHC 92 at [188]

Step 4: The order

The High Court dismissed CSSC's application for an anti-suit injunction, affirming its earlier decision after hearing further arguments. It also refused the alternative prayer for a partial injunction. No order was made as to costs of the application or of the further arguments hearing.

Terms in this case

Anti-suit injunction
An injunction directed at a party, not at the other court, restraining that party from starting or continuing proceedings in another forum, usually abroad, for example because those proceedings breach an arbitration or exclusive jurisdiction agreement or are vexatious or oppressive.
Arbitration agreement
An agreement, usually a clause in a contract, by which the parties agree to send their disputes to arbitration instead of to the courts. A court will generally stay court proceedings brought in breach of it.
Forum non conveniens
Latin for "an inconvenient forum": the principle that a court may stay proceedings before it, or refuse permission to serve a claim abroad, where a court in another country is clearly more appropriate to decide the dispute.
Exclusive jurisdiction clause
A contract term by which the parties agree that their disputes will be decided only by the courts of a named country. A court will usually stay proceedings brought elsewhere in breach of it unless strong cause is shown.

Court record

Key facts

Court High Court
Decided
Judge S Mohan
What the case was about Arbitration, Civil procedure, Contract

Source: [2024] SGHC 92, High Court, decided — eLitigation. Updated .

Judge

Parties

  • All other persons claiming or entitled to claim damage, loss, expense, indemnity arising out of contact between “LE LI” (IMO No. 9192674) and jetty/structure at Tanjung Tapa Pier on or about 31.05.22 Defendant
  • COSCO Shipping Specialized Carriers (Europe) B. V. Defendant
  • COSCO Shipping Specialized Carriers Co, Ltd Claimant
  • PT OKI Pulp & Paper Mills Defendant

Counsel

Counsel for the defendant
Counsel for the claimant

Statutes cited

Cases cited (26)

SLR (18)
  • [1997] 2 SLR(R) 148
  • [2004] 2 SLR(R) 457
  • [2007] 1 SLR(R) 377
  • [2008] 3 SLR(R) 1029
  • [2009] 3 SLR(R) 936
  • [2010] 1 SLR 1192
  • [2011] 1 SLR 391
  • [2015] 2 SLR 1020
  • [2016] 1 SLR 373
  • [2016] 5 SLR 455
  • [2017] 3 SLR 357
  • [2018] 5 SLR 425
  • [2019] 1 SLR 732
  • [2019] 2 SLR 372
  • [2021] 2 SLR 753
  • [2022] 2 SLR 380
  • [2023] 1 SLR 1
  • [2023] 1 SLR 349
UK (6)
  • [2007] UKHL 40
  • [2021] 1 WLR 5475
  • [2021] UKSC 45
  • [2022] EWHC 1953
  • [2022] EWHC 835
  • [2023] UKSC 32

Cited by (3)

Related cases

Other Singapore judgments on the same subject, most closely matched first.

Referenced in

Read the full judgment

The judgment itself is on the official Singapore Courts portal.

Read on eLitigation

Source: eLitigation ([2024] SGHC 92)

This page sets out what the court decided, for learning. It is information, not legal advice. Disclaimer