No, here. The court rejected the proprietor's account of a verbal approval, found no evidence the chairperson could approve the works alone and any reliance unreasonable, dismissed the claim, and allowed the management corporation's counterclaim with damages to be assessed.

Step 1: What happened

Mobot Pte Ltd, a bicycle manufacturing and sales business, is the subsidiary proprietor of unit #01-55 at North Spring Bizhub, an industrial development with 453 units. The defendant is the development's management corporation. In District Court Originating Claim No 111 of 2022, the claimant sued for negligent misrepresentation and negligence, and also pleaded breach of statutory duty under the Building (Strata Management) Act 2004.

The claimant said it had lodged documents for a renovation permit and that, on 16 December 2021, the defendant's chairperson, Mr Lee, verbally approved the start of works, allegedly in return for proxy support at the coming annual general meeting. It started work on 21 December 2021 and was told to stop, and it claimed loss of profits and special damages of $15,389.90. The defendant denied giving any approval, said the documents were incomplete and non-compliant, and counterclaimed for damage caused by the unauthorised works.

The documents handed in on 7 December 2021 carried no professional structural engineer's endorsement, which the Building Manual requires, and showed plans for a mezzanine. On 21 December 2021 Mr Lee and a staff member heard construction noise and found the contractors drilling and hacking, with a wall hacked, plates bolted into the wall and floor, and industrial beams on the floor.

Step 2: What the court had to decide

  1. Whether the defendant gave approval or a representation before 21 December 2021 that the claimant could proceed with the fitting out works
  2. Whether a fitting out permit ought to have been issued to the claimant after 21 December 2021
  3. Whether the claimant had any basis for a claim for breach of statutory duty or had proved any damage
  4. Whether the claimant breached the by-laws and is liable for damage to the unit on the counterclaim

Step 3: How the court reasoned

On misrepresentation, the court noted that the pleaded representation was limited to what Mr Lee allegedly said on 16 December 2021. Mr Lee's unchallenged evidence was that he told Mr Lai, the claimant's director, to supply plans endorsed by an engineer, that a mezzanine was prohibited and that he would not trade favours for votes. The claimant's theory depended on Mr Lee having power to grant approval alone, which was neither shown nor objectively plausible, and no apparent authority was pleaded. Any reliance would have been unreasonable, and Mr Lee had in fact halted the works before the meeting. The banking of the deposit cheque and the contractors' entry to the premises did not amount to approval. Later WhatsApp comments by the managing agent, Mr Tang, could not be relied on either, as he had no authority to approve renovations.

As for the period after 21 December 2021, the claimant never obtained the URA approval or waiver it was told to seek; its emails with URA answered only general queries. With no compliant application, there was no reason to issue a permit, so the negligence claim also failed and the delays were self-inflicted.

The statutory duty claim was abandoned at trial, and the court observed it would have failed anyway: s 29(2)(b) is permissive and nothing showed that the Building Manual obliged the defendant to issue a permit. No evidence of actual loss was put forward either.

On the counterclaim, unauthorised works had been carried out, so the claimant was liable for damage to the unit. It was also liable under para 5 of the Second Schedule of the Building Maintenance (Strata Management) Regulations 2005 for undisputed unauthorised works by its tenant that damaged common property, with quantum left to a bifurcated assessment.

From the judgment

“There is no evidence adduced by the claimant that Mr Lee had such authority, neither is it objectively reasonable that Mr Lee would ever have such authority to grant the approval on behalf of the defendant.”

[2026] SGDC 202 at [15]

Step 4: The order

The District Court dismissed the claim and allowed the defendant's counterclaim. The claimant was ordered to pay the defendant costs of the claim fixed at $46,000 (plus GST if any) all in, with disbursements fixed at $6,000. Interlocutory judgment was entered on the counterclaim with damages to be assessed, costs and interest of the counterclaim being reserved to the assessment, and the defendant was directed to file a summons for directions within 21 days.

The order in the court's words

Claim dismissed

“The claim is accordingly dismissed.”

Source: [2026] SGDC 202, District Court, decided 22 June 2026. Read directly from the judgment.

Terms in this case

Management corporation
The body corporate formed for a strata development when its strata title plan is registered, made up of all the unit owners (subsidiary proprietors), which manages and maintains the common property under the Building Maintenance and Strata Management Act 2004.
Negligent misrepresentation
A false statement made carelessly by someone who owed the listener a duty of care, on which the listener reasonably relied and suffered loss; it can give a claim in tort and, where it induced a contract, remedies under the Misrepresentation Act 1967.
Negligence
A tort in which a person who owes another a duty of care breaches it by falling below the required standard of care, causing damage that is not too remote; in criminal law, a failure to take reasonable care that forms part of some offences.
Counterclaim
A claim that a defendant brings against the claimant in the same proceedings, rather than starting a separate action. The court can decide the claim and the counterclaim together.
Interlocutory judgment
A judgment, including one entered by consent or in default, that decides liability or declares rights but leaves damages, an account or another matter to be decided later.
Special damages
Damages for specific losses that can be calculated in money and have already been incurred by the time of trial, such as medical bills or earnings lost before trial. They must be specifically pleaded and proved.
Assessment of damages
The stage of a civil case at which the court works out how much money is to be paid as damages, often held separately after liability has already been decided and frequently heard by a registrar.

Court record

Key facts

Court District Court
Decided
Judge Chiah Kok Khun
What the case was about Tort
Outcome Claim dismissed

Source: [2026] SGDC 202, District Court, decided — eLitigation. Updated .

Cases cited (4)

SG (2)
  • [2018] SGHC 123
  • [2021] SGHC 84
SLR (2)
  • [2007] 4 SLR(R) 100
  • [2024] 3 SLR 759

Related cases

Other Singapore judgments on the same subject, most closely matched first.

Read the full judgment

The judgment itself is on the official Singapore Courts portal.

Read on eLitigation

Source: eLitigation ([2026] SGDC 202)

This page sets out what the court decided, for learning. It is information, not legal advice. Disclaimer