Civil Procedure — Extension of time

24leadingjudgments · 5courts · civil procedure

Civil Procedure — Extension of time is a civil procedure legal concept that appears across 24 reported Singapore judgments in this corpus, decided between February 2023 and June 2026, heard in the High Court (General Division) (10), the High Court (Appellate Division) (6), and the High Court (Family Division) (4).

Civil Procedure — Extension of time is a civil procedure legal concept that appears across 24 reported Singapore judgments in this corpus, decided between February 2023 and June 2026, heard in the High Court (General Division) (10), the High Court (Appellate Division) (6), and the High Court (Family Division) (4). The most-cited authority within this corpus is [2023] SGHC(A) 5, referred to by 10 other reported Singapore judgments here. The judgments listed below are the primary source for how the Singapore courts have applied this concept, ordered by how often each is cited within this corpus. This page reports those decisions; it is reference information, not legal advice.

Key questions about Civil Procedure — Extension of time

Which Singapore cases are leading authorities on civil procedure — extension of time?

Within this corpus, the judgments most often cited by other Singapore decisions on civil procedure — extension of time are [2023] SGHC(A) 5, [2024] SGHC 243, and [2023] SGHC(A) 14. The full list of 24 judgments applying this concept is shown below, each linking to the decision in full.

Which Singapore courts have decided civil procedure — extension of time cases?

In this corpus, civil procedure — extension of time matters were decided in the High Court (General Division) (10 judgments), the High Court (Appellate Division) (6 judgments), the High Court (Family Division) (4 judgments), and the Court of Appeal (3 judgments).

How many reported civil procedure — extension of time judgments are in this corpus?

This corpus contains 24 reported judgments that apply or develop civil procedure — extension of time, decided between February 2023 and June 2026. They are listed below in order of how often each is cited within the corpus.

Which cases shaped Civil Procedure — Extension of time?

The Singapore judgments below apply or develop this concept, ordered by how often they are cited within this corpus.

[2023] SGHC(A) 5
NEWSPAPER SENG LOGISTICS PTE. LTD. v CHIAP SENG PRODUCTIONS PTE LTD
2 February 2023
SGHC(A)
cited 10× in corpus
[2024] SGHC 243
Tan Heng Khoon t/a 360 VR Cars v Wang Shing He
18 September 2024
SGHC
[2023] SGHC(A) 14
SUNPOWER SEMICONDUCTOR LIMITED v POWERCOM YURAKU PTE. LTD.
26 April 2023
SGHC(A)
[2023] SGHC 213
Singapore Medical Council
4 August 2023
SGHC
[2025] SGHCF 9
WVD & 2 Ors v WUR & 11 Ors
3 February 2025
SGHCF
[2024] SGHC(A) 20
DARSAN JITENDRA JHAVERI & 11 Ors v LAKSHMI ANIL SALGAOCAR suing as the Administratrix of the ESTATE OF ANIL VASSUDEVA SALGAOCAR (India Passport No.HXXXXXXX),deceased & Anor
25 June 2024
SGHC(A)
[2024] SGHC(A) 3
PRADEEPTO KUMAR BISWAS v SABYASACHI MUKHERJEE & Anor
31 January 2024
SGHC(A)
[2024] SGHCF 44
WXO v WXP
13 November 2024
SGHCF
[2023] SGHCF 6
WKK v WKL
16 February 2023
SGHCF
[2023] SGHC 212
Singapore Medical Council
4 August 2023
SGHC
[2023] SGHC 305
AFFERT RESOURCES PTE. LTD. (IN COURT COMPULSORY WINDING UP) v INDUSTRIES CHIMIQUES DU SENEGAL & Anor
26 October 2023
SGHC
[2026] SGHC 28
LIM KIM HUAT BUILDING CONSTRUCTION PTE LTD v LBD ENGINEERING PTE LTD
9 February 2026
SGHC
[2025] SGCA 24
Cao Pei v McCom Holding Limited
23 May 2025
SGCA
[2025] SGCA 53
AVRA INTERNATIONAL DMCC v DAVA PTE. LTD.
26 November 2025
SGCA
[2025] SGHC(A) 19
SHIPWORKS ENGINEERING PTE LTD & Anor v SEMBCORP MARINE INTEGRATED YARD PTE LTD & Anor
12 September 2025
SGHC(A)
[2025] SGHC 1
ISABELLE LEW HUEY JIUN & Anor v MICHAEL LEE YU RU & Anor
8 January 2025
SGHC
[2025] SGHC 148
Singapore Medical Council
1 August 2025
SGHC
[2025] SGHC 74
KOH LIN YEE (XU RENYI) v OVERSEA-CHINESE BANKING CORPORATION LIMITED
30 April 2025
SGHC
[2026] SGHC(A) 8
Balbeer Singh Mangat & Anor v TEMBUSU GROWTH FUND III LTD & 5 Ors
18 March 2026
SGHC(A)
[2024] SGHC(I) 10
NAVAYO INTERNATIONAL A.G. & Anor v MINISTRY OF DEFENCE, GOVERNMENT OF INDONESIA
22 April 2024
SGHC(I)
[2026] SGHC 130
Ong Cheng Cheng v Attorney-General
17 June 2026
SGHC
[2023] SGCA 16
JUMAAT BIN MOHAMED SAYED & 3 Ors v ATTORNEY-GENERAL
25 May 2023
SGCA
[2023] SGHCF 33
WKK v WKL
25 July 2023
SGHCF
[2023] SGHC 31
Pharma Inc. (Wordwide) Pte. Ltd. v Limb Salvage And Revision Arthroplasty Surgery Pte Ltd
13 February 2023
SGHC

Related

civil procedure→

Compiled by the SG Case Law editorial team from primary sources — the judgments themselves and Singapore Statutes Online (sso.agc.gov.sg). · Updated 10 July 2026 · How we compile this