JJM v JJN and others

Small Claims Tribunal

[2026] SGSCT 29 · SCT/15708/2026 · cites 5 cases

The question

Can the Small Claims Tribunals hear a claim against the guarantor of a renovation contract?

The answer

No. A guarantee is a separate promise, not a contract for services, so the tribunal discontinued the claim against the guarantor and allowed the renovator's claim against the homeowners in part, ordering them to pay $3,990.

Step 1: What happened

The claimant, Mr C, a sole proprietor running a renovation business, agreed in a written agreement dated 24 December 2024 to renovate the flat of the first and second respondents, Mr R1 and Ms R2. The price was an initial payment of $1,220 plus $17,200 payable in 36 monthly instalments, the first of $1,450 and the remaining 35 of $450 each, due on the 18th of each month up to November 2027. The agreement provided that instalments stayed payable despite incomplete work or touch-ups. The works included kitchen cabinetry, a sink support, removal of an L-shaped wall and of the common toilet doorframe, and tile touch-ups. Other contractors installed the replacement toilet door and later laid vinyl over the floor. The third respondent, Mr R3, is Ms R2's father; he signed the agreement but said he understood he was signing a guarantee.

The respondents paid $6,960 in total, including $240 for two extra items of work. Mr C originally claimed the remaining $11,700 but at the hearing limited his claim to the instalments already due. The respondents questioned how their signatures appeared on Mr C's copies of the agreement and counterclaimed, originally for $12,550, for the cost of fixing alleged defects in the sink cabinet, the toilet doorway, the floor where the wall was removed, holes and damage in the cabinets, and misaligned cabinet doors. A claim for electrical work was withdrawn after it emerged that the homeowners had arranged it privately. They relied on photographs, messages and an unsigned, undated contractor's report whose maker did not give evidence.

Step 2: What the court had to decide

  1. Did the doubts about the signatures on the claimant's copies affect the homeowners' obligations under the agreement?
  2. Did Mr R3 sign as a principal debtor or as a guarantor, and did the tribunal have jurisdiction over the claim against him?
  3. How much of the contract price had presently fallen due after crediting the payments made?
  4. Which defects did the homeowners prove, and what sums were reasonable to put them right?

Step 3: How the court reasoned

The tribunal found that the homeowners' retained copy recorded the terms they accepted, and Mr R1 confirmed the other copies had the same terms, so the photocopied signatures did not show a different bargain. On Mr R3, the agreement named him and he signed under the same words as the homeowners, but the payment terms did not say each signatory was a principal debtor. The business's own messages about in-house loan requirements distinguished documents needed from owners and from a guarantor and asked for the guarantor's details, and they supported his account. Read in that context, his signature was an undertaking to answer for the homeowners' default.

The tribunal's jurisdiction under s 5(1)(a) and the Schedule covers claims relating to a contract for goods or services. A guarantee is a separate, collateral promise, and the fact that the debt guaranteed was for renovation services did not bring a claim on it within that category, an approach the tribunal had also taken in JJA v JJB [2026] SGSCT 21. The question could be pursued in a court with jurisdiction.

Crediting $6,720 to the contract price left $11,700 unpaid, of which 12 instalments totalling $5,400 had fallen due. Mr C owed a duty of reasonable skill and care, and the cost of repair could be recovered if reasonable and proportionate. Because the report was unsigned and its maker absent, it was given limited weight and checked against photographs and testimony. The tribunal allowed $300 for rough finishing on the sink panel, finding the panels were part of Mr C's work rather than a private favour by his carpenter; $800 for poor making good around the toilet doorway, but not the $1,800 to reposition a frame another contractor had fitted; $130 for patched holes in the cabinets; and $180 for adjusting misaligned doors. The floor claim failed because the evidence did not show whether the slope came from defective tiling or from the existing difference in floor levels that Mr C described, and the replacement of the cabinet supports was not shown to leave a continuing defect.

From the judgment

“I therefore find that Mr R3 signed as a guarantor and did not assume the homeowners’ primary obligation to pay the renovation price.”

[2026] SGSCT 29 at [16]

“In my view, the fact that the debt guaranteed is payment for renovation works does not bring the claim against Mr R3 within the statutory category concerning contracts for the provision of services.”

[2026] SGSCT 29 at [19]

Step 4: The order

The tribunal allowed the claim in part. It found Mr R3 had signed as a guarantor and discontinued the claim against him under s 5(5) of the Small Claims Tribunals Act 1984, as a claim on a guarantee fell outside its jurisdiction; it made no finding on the guarantee's enforceability. The accrued instalments were $5,400. The counterclaim succeeded for $1,410, and the claim for $2,350 for the uneven floor was dismissed along with the other unproved items. Mr R1 and Ms R2 were ordered jointly to pay Mr C $3,990 by 28 October 2026, with later instalments, starting with $450 on 18 October 2026, remaining payable under the agreement. No award was made to Mr R3 and there was no order on costs.

The order in the court's words

Claim allowed in part

“I therefore order Mr R1 and Ms R2 jointly to pay Mr C that sum by 28 October 2026.”

Source: [2026] SGSCT 29, Small Claims Tribunal, decided 14 October 2026. Read directly from the judgment.

Terms in this case

Counterclaim
A claim that a defendant brings against the claimant in the same proceedings, rather than starting a separate action. The court can decide the claim and the counterclaim together.
Guarantee
A promise by one person (the guarantor) to answer for another person's debt or obligation if that other person fails to meet it. The guarantor's liability is secondary to the principal debtor's, and under the Civil Law Act 1909 a guarantee must be evidenced in writing signed by the guarantor to be enforceable.

Court record

Key facts

Court Small Claims Tribunal
Decided
Judge Jared Kang Chern Wey
What the case was about Courts and Jurisdiction, Credit and Security, Building and Construction Law
Outcome Claim allowed in part

Source: [2026] SGSCT 29, Small Claims Tribunal, decided — eLitigation. Updated .

Judge

Parties

  • JJM Claimant
  • JJN Respondent
  • JJO Respondent
  • JJP Respondent

Cases cited (5)

SLR (5)
  • [2008] 2 SLR(R) 623
  • [2009] 3 SLR(R) 689
  • [2011] 4 SLR 559
  • [2018] 1 SLR 170
  • [2025] 1 SLR 306

Related cases

Other Singapore judgments on the same subject, most closely matched first.

Read the full judgment

The judgment itself is on the official Singapore Courts portal.

Read on eLitigation

Source: eLitigation ([2026] SGSCT 29)

This page sets out what the court decided, for learning. It is information, not legal advice. Disclaimer