Pierre Andre Jacques Lorinet v Helu-Trans (S) Pte Ltd

High Court

[2025] SGHC 66 · HC/OC 269/2022 · cites 14 cases (12 Singapore, 2 foreign)

Step 1: What happened

Lorinet, Pierre Andre Jacques v Helu-Trans (S) Pte Ltd was a trial in Originating Claim No 269 of 2022 in the General Division of the High Court, brought in Mr Lorinet's name by his subrogated insurers. Mr Lorinet bought Sir Anish Kapoor's sculpture "Untitled (Red Apple)", an egg-shaped bowl weighing approximately 22.8 kg, on 30 May 2012 for £522,000.

When he moved home in 2014 he engaged the movers Helu-Trans, on a quotation that incorporated its Uniform Trading Conditions, to uninstall, transport and reinstall his artworks. No installation instructions were sought or given. On 7 May 2014 its workers mounted the sculpture on a living room wall using a 5 cm-long screw with washers in a rawl plug. Mr Lorinet said it fell on 18 September 2016 while he was overseas, his wife having found it on the floor after hearing a loud noise. The insurers' loss adjusters attributed the fall to the screw fixation. The insurers paid out, had the sculpture restored at the cost of £81,850.04 and sold it at auction for £180,000.

The action, filed on 16 September 2022, alleged that the screw was too small to bear the sculpture's weight over time, in breach of duties in contract and tort. Helu-Trans pleaded limitation against the contract claim, relied on exclusion and limitation clauses, said no separate tort duty arose, and maintained the installation was proper.

Step 2: What the court had to decide

  1. Whether the claims in contract and in tort were time-barred
  2. Whether Helu-Trans owed a duty of care in tort alongside its contractual duty
  3. Whether the exclusion and limitation clauses in the Conditions applied
  4. Whether Helu-Trans breached its duty and caused the sculpture's fall

Step 3: How the court reasoned

A contract claim accrues on breach, here the installation on 7 May 2014, so the six-year period under s 24A(3)(a) of the Limitation Act 1959 had long expired, and the postponed period gave no help because the loss adjusters' first report of 15 October 2016 supplied the required knowledge. A negligence claim accrues when damage occurs. The court accepted the contemporaneous emails that the sculpture fell on 18 September 2016, so the tort claim was brought two days before time ran out.

Helu-Trans conceded foreseeability and proximity under Spandeck Engineering (S) Pte Ltd v Defence Science & Technology Agency [2007] 4 SLR(R) 100. The court respectfully departed from the reasoning in [2023] SGHC 264 that a tort duty coterminous with a contractual duty is for that reason alone superimposed. Relying on Go Dante Yap v Bank Austria Creditanstalt AG [2011] 4 SLR 559, it held that the policy concern is with upsetting the parties' agreed allocation of risk.

There was no such upset because none of the clauses would have protected Helu-Trans. Read in context, the custody-and-control and seven-day notice clauses dealt with loss or damage while services were being performed or in transit, not later. The weight-based cap, worth $22.80 for a six-figure artwork, would have failed the reasonableness test under the Unfair Contract Terms Act 1977.

On breach, the fact of the fall proved nothing by itself, and the lack of pre-installation checks was beside the point. The experts agreed the wall material failed, not the screw or sculpture, yet there was no evidence of the wall's composition or the hole size. The defendant's own tests, unwitnessed by Mr Lorinet, were given little weight. The adequacy of the mounting could not be determined. On causation, the wife's account was inadmissible hearsay, res ipsa loquitur failed because Helu-Trans was not in control more than two years after installation, and the forensic evidence was inconclusive.

From the judgment

“Overall, the fact that the Sculpture fell is only the starting point and the real question is why the Sculpture fell.”

[2025] SGHC 66 at [52]

Step 4: The order

The court dismissed Mr Lorinet's claims. The contract claim was time-barred; the tort claim was in time and a duty of care was owed, but breach was not proved and, even assuming breach, causation was not shown. The court did not decide quantum or mitigation and would hear counsel on costs.

Court record

Key facts

Court High Court
Decided
Judge Lee Seiu Kin
What the case was about Tort, Contract, Limitation of Actions

Source: [2025] SGHC 66, High Court, decided — eLitigation. Updated .

Judge

Parties

  • Helu-Trans (S) Pte Ltd Defendant
  • Pierre Andre Jacques Lorinet Plaintiff

Counsel

Counsel for the defendant
Counsel for the plaintiff

Statutes cited

Unfair Contract Terms Act
s 3(2)(a)

Cases cited (14)

SLR (8)
  • [1997] 2 SLR(R) 709
  • [1999] 2 SLR(R) 1035
  • [2006] 3 SLR(R) 116
  • [2007] 4 SLR(R) 100
  • [2008] 4 SLR(R) 165
  • [2011] 2 SLR 146
  • [2011] 4 SLR 559
  • [2020] 2 SLR 272
UK (2)
  • [1990] 1 QB 993
  • [1995] 2 AC 145

Related cases

Other Singapore judgments on the same subject, most closely matched first.

  • The Appellate Division dismissed the appeal in its entirety and ordered Mr Tantular to pay costs of S$45,000 (all-in), the sum reflecting that the respondent had lost on several issues.

    High Court (Appellate Division) · 1 July 2025 · [2025] SGHC(A) 8
  • The Court of Appeal allowed the appeal and set aside the Judge's order striking out OC 366.

    Court of Appeal · 17 July 2026 · [2026] SGCA 34
  • District Judge Tay Jingxi allowed the claim in part, awarding $13,664.13, made up of $4,314.13 under Invoice 22003 and $9,350 under Invoice 23004.

    Magistrate Court · 12 June 2026 · [2026] SGMC 71
  • The Magistrate's Court allowed the claim, entering judgment for Huttons for $28,080, being $26,000 plus the then-prevailing GST, dismissed the defendant's counterclaim, and directed written…

    Magistrate Court · 23 January 2026 · [2026] SGMC 12
  • The Appellate Division dismissed the appeal in its entirety and upheld the dismissal of all three claims.

    High Court (Appellate Division) · 22 August 2025 · [2025] SGHC(A) 13
  • The court dismissed Mr Glassberg's claim for damages and interest in full, finding against him on authority, contract, tort, the Unfair Contract Terms Act and vicarious liability.

    High Court · 10 January 2025 · [2025] SGHC 4

Referenced in

Statutes interpreted in this judgment

Read the full judgment

The judgment itself is on the official Singapore Courts portal.

Read on eLitigation

Source: eLitigation ([2025] SGHC 66)

This page sets out what the court decided, for learning. It is information, not legal advice. Disclaimer