Calpeda Asia Pacific Pte Ltd v Chew Construction & Plumbing Pte. Ltd.
[2023] SGHC 102 · HC/S 913/2021 · cites 2 cases (1 Singapore, 1 foreign)
Step 1: What happened
Chew Construction & Plumbing Pte Ltd engaged Calpeda Asia Pacific Pte Ltd to supply and install pumps on five building projects: Punggol NorthShore C1 & C2 (with two variation orders), How Sun Road, HDB C39, Sembawang and The Terrace@Punggol. In Suit No 913 of 2021 Calpeda claimed $683,147.92 in unpaid invoices and retention sums across the five projects.
Chew Construction counterclaimed $683,664.73. It said Calpeda had installed pumps that were unfit for purpose and abandoned the C1&C2 project without doing maintenance; that it had to pay back charges of $169,400 and replastering costs of $442,146.98 because Calpeda hacked through riser floors; that Calpeda had committed fraud on HDB inspectors by moving a pump between blocks for inspection, warranting exemplary damages; that it paid more to third parties to finish work on How Sun and C39; that the Sembawang retention sum was not yet due when the suit began; and that leakages from Calpeda's pumps at Terrace caused it $25,492.75 in damage.
Step 2: What the court had to decide
- Whether the C1&C2 pumps were unfit for purpose and whether Calpeda abandoned the project
- Whether Calpeda was liable for the riser hacking costs and for exemplary damages for alleged fraud
- Whether Chew Construction could recover the extra costs of third parties on How Sun and C39
- Whether the Sembawang retention sum was due when the suit was filed, and whether the Terrace counterclaim was proved
Step 3: How the court reasoned
On C1&C2, Chew Construction's own managing director accepted at trial that he did not say the pumps were unfit for purpose, no list of defects existed, and residents had moved in. Calpeda had not maintained the pumps, but only because Chew Construction ignored its three requests to be put in touch with the Town Council, so the breach was wholly attributable to Chew Construction.
Pipe sleeves and civil works were excluded from Calpeda's quotations, Calpeda was never told when the risers would be covered, and Chew Construction knew the risers would be drilled; nor did it prove it had actually incurred the costs. There was no legal basis for exemplary damages, any fraud would have been on HDB, and Chew Construction conceded the evidence, being hearsay, did not prove fraud.
For How Sun, Chew Construction bought the irrigation pump from another supplier without telling Calpeda, which remained willing to install it. For C39, the evidence showed the parties had replaced the original quotation with a reduced July 2021 Quotation.
Even on Chew Construction's longer defects period, the Sembawang retention sum fell due months before the suit, so the authority on causes of action not yet existing did not help. For Terrace, the retention was admitted due, and nothing linked the items in the debit note to Calpeda's work.
“While Calpeda was in breach of its obligations, this breach may be wholly attributed to Chew Construction, who is thus not entitled to seek a reduction in the amount due to Calpeda on this basis.”
[2023] SGHC 102 at [24]
Step 4: The order
The court allowed Calpeda's claim for $683,147.92 with interest at 5.33% per annum from service of the writ to judgment, and dismissed Chew Construction's counterclaim in full. The $200,000 Chew Construction had paid into court was to be released to Calpeda towards the judgment sum, with costs to be agreed or submitted.
Court record
Key facts
| Court | High Court |
|---|---|
| Decided | |
| Judge | Kwek Mean Luck |
| What the case was about | Building and Construction Law |
Source: [2023] SGHC 102, High Court, decided — eLitigation. Updated .
Judge
- Kwek Mean Luck Delivered the judgment
Parties
- Calpeda Asia Pacific Pte Ltd Plaintiff
- Chew Construction & Plumbing Pte Ltd Defendant
Counsel
- Ethos Law Corporation Firm
- Debbie Lee
- Oh Kim Heoh Mimi
Statutes cited
Cases cited (2)
- [1994] 1 SLR(R) 505
- [2002] 1 AC 122
Related cases
Other Singapore judgments on the same subject, most closely matched first.
-
The court allowed the club's claim and the contractor's counterclaim in part.
High Court · 20 February 2026 · [2026] SGHC 39 -
The Appellate Division allowed the appeal in part.
High Court (Appellate Division) · 2 January 2024 · [2024] SGHC(A) 1 -
Kwek Mean Luck J allowed Terrenus's claims in part, awarding nominal damages of $1,500 for each of the embedment and clearance breaches, $912 for six insufficiently ground roots and $30,600 in…
High Court · 27 November 2023 · [2023] SGHC 333 -
The court allowed Pro-Active's claim in part, giving judgment for $179,151.04 with interest at 5.33% per annum from 6 November 2021 until payment, instead of the $558,559.97 claimed.
High Court · 31 July 2023 · [2023] SGHC 205 -
The District Court allowed the claim in part.
District Court · 13 January 2026 · [2026] SGDC 23 -
The Appellate Division (Woo Bih Li, Kannan Ramesh and See Kee Oon JJAD) dismissed Terrenus's appeal and allowed Attika's cross-appeal.
High Court (Appellate Division) · 26 February 2025 · [2025] SGHC(A) 4
Read the full judgment
The judgment itself is on the official Singapore Courts portal.
Read on eLitigationSource: eLitigation ([2023] SGHC 102)
This page sets out what the court decided, for learning. It is information, not legal advice. Disclaimer