Source: [2023] SGHC 205, High Court (General Division), decided — eLitigation. Updated .
Catchwords
Practice Areas
Judges (1)
Counsel (5)
Parties (2)
Case Significance
Pro-Active Engineering Pte Ltd v Prime Structures Engineering Pte Ltd [2023] SGHC 205 is a reserved judgment of Lai Siu Chiu SJ in the General Division of the High Court, delivered on 31 July 2023 in Suit No 907 of 2021. In this suit Pro-Active Engineering Pte Ltd ("Pro-Active") sued Prime Structures Engineering Pte Ltd ("Prime") for $558,559.97 arising out of works carried out on a building known as SOUTHERNWOOD at No 79 Robinson Road, Singapore, a project now known as CapitaSky whose developer was Capitaland and main contractor Shimizu Corporation (Singapore) Ltd. Prime, a subcontractor on the project, had engaged Pro-Active to supply, fabricate and install steel works by way of a letter of appointment dated 9 January 2019; the judgment addresses building and construction contracts, variations, back charges, extension of time and liquidated damages, and damages for delay.
Summary
Pro-Active Engineering, a sub-contractor engaged to supply, fabricate and install steel works on the CapitaSky project, sued Prime Structures Engineering for $558,559.97 arising from the works. The General Division of the High Court found Pro-Active had not proven its full claim and awarded it only $179,151.04 with interest, while ordering nominal costs to Pro-Active following Prime's late withdrawal of its liquidated damages counterclaim.
What was Pro-Active Engineering v Prime Structures Engineering [2023] SGHC 205 about?
It was a building and construction dispute before Lai Siu Chiu SJ, decided on 31 July 2023, in which Pro-Active Engineering Pte Ltd sued Prime Structures Engineering Pte Ltd for $558,559.97 over steel works carried out on the SOUTHERNWOOD project at No 79 Robinson Road.
What was the project at issue in [2023] SGHC 205?
The works concerned SOUTHERNWOOD at No 79 Robinson Road, Singapore, now known as CapitaSky, developed by Capitaland with main contractor Shimizu Corporation (Singapore) Ltd; subcontractor Prime engaged Pro-Active to supply, fabricate and install steel works under a letter of appointment dated 9 January 2019.
Cases Cited (1)
Cited By (1)
Related cases
Other Singapore judgments on the same subject, most closely matched first.
Referenced in
Judgment
Read the full judgment on the official Singapore Courts portal.
Read on eLitigationSource: eLitigation ([2023] SGHC 205)